Live webinar · Microsoft Teams

Lean Engineering for Real Industrial Projects

A different way to move from first advice and FEED to practical execution support

Date

4 November 2026

Time

15:30–16:30 CET
Where
Microsoft Teams

Reserve your place

Free to attend. Registration takes place on Microsoft Teams, where you’ll receive your personal join link and a calendar invite.

1

Click the button below

2

Fill in your details on the Teams registration page

3

Receive your join link by email

Opens the official Microsoft Teams registration page in a new tab. Questions? hello@bmprocess.nl

Why this webinar

Too much structure for the job?

What’s in it for you

01

Senior judgement

02

Flexibility

03

No heavyweight overhead

Many smaller industrial and brownfield projects need senior judgement, not a heavyweight project structure with heavyweight overhead. They need people who understand the plant, ask the right questions, define the problem properly and then bring in the engineering capacity that is actually required.
BM Process stays close to the client, understands the plant and defines what is needed. EPCM adds scalable multidisciplinary engineering and project-delivery capability when the project requires it. In this webinar, Bart Muijtjens (BM Process Management), Menno Gazendam (EPCM Holdings) and Alexandra Gazendam-Schulze (EPCM Europe) show that approach through three real project stories from their own portfolios. Amol Palve (BM Process Management) moderates.
Where we come in

From first advice to execution support

Scope and resources are matched to the phase. BM Process leads at the front end; EPCM adds engineering capacity and disciplines as the project requires.

01

Advice & feasibility

02

FEED / basic engineering

03

Detailed engineering

04

Execution support

BM Process
Client-side front end
BM Process as owner’s engineer, where useful
EPCM
Scalable engineering and project delivery
Each project is scoped and contracted individually.
What you’ll hear

Three real project stories

01

Challenge the specification

When every bidder priced the same excessive scope, the answer was engineering judgement, not engineering hours.

02

De-risk an international project

Contracting, logistics and mobilisation: the execution constraints you won’t find on a process flow diagram.

03

Put skin in the game

Taking ownership of the next step instead of leaving the client with another consulting report.
Technical Q&A

Questions we'll answer live

Have a question about your own project? Send it in advance and we’ll try to cover it.

Q1

When is a full EPC contractor overkill for a brownfield project?

Q2

How do you challenge an overdesigned Basis of Design without adding risk?

Q3

What should be fixed at FEED to avoid surprises in detailed engineering?

Q4

How do you scale engineering capacity mid-project without losing continuity?

Q5

Which execution constraints should you assess before the first P&ID?
Disciplines

The engineering behind it

Process
Piping
Mechanical
E/I & Automation
Civil & structural
3D modelling & drafting
Project management

Typical projects

VRU revamps and carbon changes
Thermal oxidiser (RTO) implementation
Vapour treatment masterplans for tank terminals
Brownfield tie-ins and plant modifications
Emission compliance studies
Speakers

Engineers and a mathematician

Bart Muijtjens

Speaker · Managing Director, BM Process Management
20+ years in process engineering and emission control. Previously at Jacobs, Fluor, GEA and Vopak.
Menno Gazendam

Menno Gazendam

Speaker · Head of Business Development, EPCM Holdings
Civil engineer (MSc) with project experience in more than 30 countries.
Alexandra Gazendam-Schulze

Alexandra Gazendam-Schulze

Speaker, EPCM Europe
Business development contact for EPCM in Europe.

Amol Palve

Moderator, BM Process Management
Business development and partnerships in the process industry.
Who should attend

Built for people who deliver real plant projects

Plant and technical managers
Engineering and project managers
Terminal and tank-storage operators
Chemical and process manufacturers
Brownfield and live-plant projects
Emission control
Small and medium CAPEX
Provisional agenda · 60 minutes

01

How Bart and Menno met, and why it worked

02

The customer problem: too much structure for the job?

03

Three real project stories

04

What the model means for European clients

05

Poll and Q&A

06

Closing and next steps
Complimentary · Request by 30 November 2026

Complimentary Engineering Health Check

Webinar participants and members of the wider BM Process network will also have the opportunity to request a complimentary Engineering Health Check.
If you have an active or upcoming industrial project, bring us the challenge.
BM Process and EPCM will take an initial look with you and discuss:

01

Project scope

02

Current assumptions

03

Engineering readiness

04

Potential overdesign

05

Execution risks

06

Likely next steps
Step 1
Request
Send us your project before 30 November 2026.
Step 2
Initial look
BM Process and EPCM review it with you.
Step 3
Report
You receive a written Health Check report afterwards.