Project: Carbon change and revamp of VRU system
Client: Zenith
Location: Amsterdam / The Netherlands
Period: 2019 – 2021
Project goal: Assess the condition of the existing VRU system for the treatment of the vapour stream from truck and ship loading, consult and execute the carbon change and provide scope for the upgrade of the system. Goal is to increase reliability and emission compliance of the entire system for the long term.
Services provided:
- Acting as owner’s engineer: in house process expert
- Review of unit performance
- Carbon condition check and analysis of lab results
- Scope definition for carbon change
- Scope definition of hard- and software upgrades
- Define scope for update of PLC and SCADA systems and user interface
- Development of a Basis of Design
- On site support and project management for the carbon change
- Equipment, instrumentation and contractor selection
- Scope of work definition mechanical / process / instrumentation / automation
- Implementation of temporary treatment systems to limit downtime
- FAT, SAT and commissioning support
- Revision of operating manuals, providing operator training