Project: Support implementation of new VRU system
Client: GPS Group
Location: Amsterdam / The Netherlands
Period: 2021 – ongoing
Project goal: Support the client in implementing a new VRU system in the terminal. Determine gaps in the process design and help resolve issues identified. Support on developing an emission measurement- and control plan for acceptance by authorities.
Services provided:
- Acting as owner’s engineer: in house process expert
- Review of total vapour situation on the terminal
- Review of all present installations: design windows, expansion possibilities
- Review process design of new VRU installation and identify possible gaps
- Design the process connections of the new system to the terminal’s vapour system
- Line sizing calculations, vent stack design, selection of detonation arresters
- Identify issues after construction of the new VRU and determine solutions
- Drafting of an emission measurement and control program
- Develop acceptance test procedures and measurement programmes
- Support in communication with authorities and permitting procedures