Project: Upgrade vapour recovery unit truck loading bays

Client: Koole

Location: Rotterdam / The Netherlands

Period: 2021 – ongoing

Project goal: Assess the condition of the existing VRU system for the treatment of the vapour stream from truck loading of gasoline, propose the optimal solution (new unit vs revision of existing hardware) with the goal to ensure operational reliability and emission compliance. 

Services provided:

  • Acting as owner’s engineer: in house process expert
  • Review of unit performance
  • Solution definition / feasibility engineering
  • Scope definition
  • Technical specification for procurement
  • Equipment and contractor selection
  • Scope of work definition mechanical / process
  • Implementation of temporary treatment systems to limit downtime
  • Automation scope definition
  • FAT, SAT and commissioning support
  • Revision of operating manuals, providing operator training